Spacecab was delighted to win the contract to supply the Munster Rugby Branch with a ‘State of the Art’ 470m2 architecturally designed Modular building for their head office at Musgrave Park, Cork.
This building was fabricated, installed and completed within 12 weeks from date of order. The finished building, although simple in design, was finished using materials of the highest quality.
Steel frame modules (with CE certification) provided the main structural element of the building. Kingspan insulated panels were used to manufacture the external wall panels. Powder coated aluminium fascia and windows were fitted to match the branded colours of the client.
The electrical and mechanical specifications were designed by an In House Engineer to the very highest standard. The interior of the building was fitted with high quality materials, which gave a modern and stylish look and reflects the professionalism and esteem of our client. All in all we are very proud of this project and our customer is equally pleased.