After a rigorous process of elimination Spacecab were contracted by Novartis to supply a 900m2 building to house Arup and Project Management, their on-site Consultant Engineers. We worked closely with these Consultant Engineers to design a building that would be spacious, would blend well with the main factory, would stand the test of time and be cost effective.
This was achieved using 25 No. 12m x 3m steelframe modules and with most of the construction done off site there was minimum disruption to the plant. We were regularly commended on our high level of Health and Safety compliance which is something we strive to achieve and are extremely proud of.